BSC Construction Group managed every phase of this ground-up residential scheme, from clearing the original site through groundwork and structural construction to internal fit-out, external detailing and final handover.
Completed in September 2025, the development delivered four luxury two-bedroom apartments combining contemporary living spaces with private outside space, dedicated parking, EV charging and energy-efficient air-source heat-pump technology
The project began with the controlled dismantling of the outdated building. BSC coordinated waste removal and site preparation in line with safety and environmental requirements, establishing a clear and properly managed platform for the new development.
With the plot cleared, the team progressed new foundations and blockwork to form the structural core. Coordination across insulation, drainage and building services is focused on modern performance standards, long-term durability and energy efficiency.cco detailing and original iron glazing bars.
Delivering a high-quality multi-unit scheme on an established residential road requires disciplined sequencing, careful logistics and consistent quality control from the earliest groundworks through to the finishing trades.
BSC provided single-point coordination across the full construction programme. The 3m change in level from the street to the rear garden required carefully sequenced excavation, retaining-wall construction in a restricted space, and the installation of pumping stations. Groundwork, structural packages, services and finishes were managed as one integrated delivery sequence.
Residential
Bushey, Hertfordshire
£1.2M
12 months
2025
Main contractor
4 × 2-bedroom apartments
Scope of works
image gallery
Each apartment was completed with close attention to the relationship between structure, services and finishes. Contemporary kitchens, generous glazing and direct connections to private outside space create bright, practical homes designed for modern living.
The completed project successfully returned two long-vacant listed buildings to active use and delivered characterful new homes in the heart of the Jewellery Quarter. The refurbishment conserved important heritage details while providing the performance, comfort and security expected of contemporary apartments.
Whether delivering a single dwelling or a multi-unit scheme, BSC Construction Group brings the same efficiency, precision and pride to every stage. At Richfield Road, that means managing the complete journey—from site clearance and structure to services, finishes and handover—with a consistent focus on build quality.
4×
2-bedroom apartments
2024
PROJECT STARTED
£1.2m
project vaule